Barrackville Sewer System Improvements

This project will consist of the replacement of failing sewers in the Mohawk B area where no work was done previously. Separation of sanitary sewers from old sewers used for storm sewers along Pike Street. The separation along Pike Street will also allow for the elimination of the C004, Covered Bridge outfall. Elimination of the C011, Cook Street Lift Station outfall with the use of upgraded pumps running on variable frequency drives to accommodate changes in flow. Manhole rehabilitation to the town’s sanitary sewer system to reduce I&I in the sewer-shed areas. Installation of flow monitoring devices on the C012, Mohawk Lift Station and C013, Ices Run Lift Station outfalls to track progress in I&I reduction and estimate the quantity of CSO discharge to be treated, pumped, or stored in Phase VI.