Fairview Water System Improvements Project Phase I & II

Phase I – The project will include a connection to the Monumental PSD; this will consist of a booster pump station and a new 6-inch main; repair and refurbishment of two existing water tanks, upgrade access roads, replace telemetry system and construct new water office.

Phase II - The Town of Fairview is proposing to replace and upgrade portions of their water distribution system due to deteriorating and substandard lines. The project will consist of replacing 5,600 linear feet of 2” galvanized line, 5,100 linear feet of 6” inch line, multiple valve replacements, replacing the ¾ inch galvanized service lines, install new fire hydrants and to purchase a Portable Godwin Pump to provide emergency back-up for the booster pumping station.