Ices Run PSD Water System Improvements Project Phase II

The Phase II project consists of installing 1,800 LF of 6” HDPE water line from the Fairmont master meter to the Goose Run Booster Pump Station, 4,700 LF of 6” HDPE water line in the Dunkard Mill area, 2,400 LF of new 6” HDPE water line from Mill Fall Road to White Rock Road, A new booster pump station along Mill Fall Road, A new pressure reducing valve station along Katy Road, A new control valve station along Route 250, and upgrades to the existing access road to the Chatham Hill water tank.