Lost Creek Community Building/Park/Stormwater Upgrades

Infrastructure upgrade to alleviate flooding of the town's office and community center building as well as the Lost Creek VFD. Remove several inches of existing gravel parking lot stone, mill existing street grade, install a proper drainage system with two outlets, then pave the street (750 linear feet) and parking lot. Existing overhead utilities are proposed to be relocated to the edge of the parking and street areas.