The proposed critical needs project would consist of 35,800 feet of 4” water mains and 852 feet of 2” water mains to serve 44 residents and a Church. These people have been pleading for public water for quite some time with hopes that it may soon be funded. The proposed facilities would also enable the Town to eliminate a constant pressure pumping station that has been troublesome to them over the years.