Newburg Water to Independence Water Line Extension

The proposed critical needs project would consist of 35,800 feet of 4” water mains and 852 feet of 2” water mains to serve 44 residents and a Church. These people have been pleading for public water for quite some time with hopes that it may soon be funded. The proposed facilities would also enable the Town to eliminate a constant pressure pumping station that has been troublesome to them over the years.