Summit Park PSD Sewer

Sanitary Sewer Evaluation Survey (SSES) and analysis of Lift Station D as part of an overall sewer system rehabilitation project. SSES includes smoke testing, manhole inspection, and other studies to identify locations of non-sanitary sewer flows and I&I entering into the sewer collection system and will also evaluate the overall condition of the existing system. Results will be used to develop the overall scope of the rehabilitation project and used to determine if the current capacity meets requirements. Study, report, and design phases are ongoing.