The proposed project will consist of replacing 12,600 LF of 6-inch water mains, 20,000 LF of 2-inch water mains, valves and fire hydrants, pressure reducing stations, and installing leak detection meters.
The proposed project will consist of replacing 12,600 LF of 6-inch water mains, 20,000 LF of 2-inch water mains, valves and fire hydrants, pressure reducing stations, and installing leak detection meters.